Customers/Equipment Configs
OP

4 Discontinued Components Detected

Review equipment configurations and generate replacement recommendations for affected customers.

Refinery Block C — Pressure Control LoopOperational1 discontinued
Petro-Gulf Refineries Ltd.

LocationDubai Refinery, Block C
Install DateApr 15, 2020
Last ServicedMar 10, 2026

Components (3)

VX-442 High-Pressure Valve

VX-442-HP · Qty 6

Active

TX-900 Smart Pressure Transmitter

TX-900-PT · Qty 4

Active

VX-380 Control Valve (Discontinued)

VX-380-CV · Qty 2

Discontinued

Main pressure control system for crude distillation unit. Annual valve inspection due October.

Chemical Reactor Loop A — TX MonitoringMaintenance Required1 discontinued
Dresdner Chemie GmbH

LocationDresden Chemical Plant, Building 3
Install DateNov 20, 2019
Last ServicedJan 15, 2026

Components (3)

TX-700 Pressure Transmitter (Discontinued)

TX-700-PT · Qty 8

Discontinued

CX-220 Corrosion-Resistant Fitting

CX-220-CF · Qty 30

Active

TT-480 Temperature Transmitter

TT-480-TT · Qty 20

Active

TX-700 series transmitters are discontinued and creating compliance risk. Urgent replacement evaluation needed.

Plant B — ATEX Zone 1 InstrumentationOperational1 discontinued
Gulf Petrochemicals FZCO

LocationSharjah Industrial Zone, Plant B
Install DateMar 15, 2021
Last ServicedFeb 20, 2026

Components (3)

VX-442 High-Pressure Valve

VX-442-HP · Qty 8

Active

AT-600 ATEX Pressure Transmitter

AT-600-PT · Qty 10

Active

VX-380 Control Valve (Discontinued)

VX-380-CV · Qty 6

Discontinued

ATEX Zone 1 certified installation. Biennial ATEX inspection due March 2027.

Turbine Hall — Differential Pressure MonitoringMaintenance Required1 discontinued
Danube Hydropower AG

LocationDanube Hydropower Station, Turbine Hall
Install DateJun 1, 2022
Last ServicedMay 10, 2025

Components (2)

PT-Series Turbine Pressure Transmitter (Discontinued)

PT-800-TP · Qty 8

Discontinued

LT-300 Level Transmitter

LT-300-LT · Qty 4

Active

PT-800 series transmitters discontinued August 2025. Annual service window approaching. Replacement ordering is critical.

FAB 3 — UHP Process Gas MonitoringOperational
Kyushu Semiconductor Fab

LocationKyushu FAB 3, Gas Delivery Systems
Install DateMay 20, 2021
Last ServicedAug 30, 2025

Components (2)

FP-200 High-Purity Fitting

FP-200-HP · Qty 180

Active

TX-900 Smart Pressure Transmitter

TX-900-PT · Qty 30

Active

Ultra-high purity system. Particle count monitoring required. Annual certification of all fittings.

LNG Jetty 2 — Cryogenic InstrumentationMaintenance Required
Caribbean LNG Terminal

LocationPort of Spain — LNG Jetty 2
Install DateMar 10, 2020
Last ServicedFeb 28, 2025

Components (1)

CR-800 Cryogenic Pressure Sensor

CR-800-CS · Qty 6

Flagged

Cryogenic sensors approaching 5-year certification limit. Recertification or replacement required before June maintenance window.