4 Discontinued Components Detected
Review equipment configurations and generate replacement recommendations for affected customers.
Refinery Block C — Pressure Control LoopOperational1 discontinuedPetro-Gulf Refineries Ltd.
Components (3)
VX-442 High-Pressure Valve
VX-442-HP · Qty 6
TX-900 Smart Pressure Transmitter
TX-900-PT · Qty 4
VX-380 Control Valve (Discontinued)
VX-380-CV · Qty 2
Main pressure control system for crude distillation unit. Annual valve inspection due October.
Chemical Reactor Loop A — TX MonitoringMaintenance Required1 discontinuedDresdner Chemie GmbH
Components (3)
TX-700 Pressure Transmitter (Discontinued)
TX-700-PT · Qty 8
CX-220 Corrosion-Resistant Fitting
CX-220-CF · Qty 30
TT-480 Temperature Transmitter
TT-480-TT · Qty 20
TX-700 series transmitters are discontinued and creating compliance risk. Urgent replacement evaluation needed.
Plant B — ATEX Zone 1 InstrumentationOperational1 discontinuedGulf Petrochemicals FZCO
Components (3)
VX-442 High-Pressure Valve
VX-442-HP · Qty 8
AT-600 ATEX Pressure Transmitter
AT-600-PT · Qty 10
VX-380 Control Valve (Discontinued)
VX-380-CV · Qty 6
ATEX Zone 1 certified installation. Biennial ATEX inspection due March 2027.
Turbine Hall — Differential Pressure MonitoringMaintenance Required1 discontinuedDanube Hydropower AG
Components (2)
PT-Series Turbine Pressure Transmitter (Discontinued)
PT-800-TP · Qty 8
LT-300 Level Transmitter
LT-300-LT · Qty 4
PT-800 series transmitters discontinued August 2025. Annual service window approaching. Replacement ordering is critical.
FAB 3 — UHP Process Gas MonitoringOperationalKyushu Semiconductor Fab
Components (2)
FP-200 High-Purity Fitting
FP-200-HP · Qty 180
TX-900 Smart Pressure Transmitter
TX-900-PT · Qty 30
Ultra-high purity system. Particle count monitoring required. Annual certification of all fittings.
LNG Jetty 2 — Cryogenic InstrumentationMaintenance RequiredCaribbean LNG Terminal
Components (1)
CR-800 Cryogenic Pressure Sensor
CR-800-CS · Qty 6
Cryogenic sensors approaching 5-year certification limit. Recertification or replacement required before June maintenance window.